Subcontractor Agreement Template for Construction

Created November 15, 2026 · Updated November 15, 2026

This subcontractor agreement is a contractor-friendly contract for the construction industry, for a main contractor engaging a trade subcontractor on a building project. The work is priced as a fixed lump sum and paid when the main contractor is paid, 3% of each payment is retained until the end of the defects period, and any delay damages under the main contract are passed down to the subcontractor in full. The subcontractor works to the drawings and specifications, follows the programme, coordinates with other trades and complies with health and safety rules on site.

Use it when you bring in electricians, plumbers, roofers, steel fixers or any other trade on a construction project and need their obligations to match the ones you owe your client.

The agreement has 16 sections. Subcontract Works, Drawings and Specifications defines the work. Incorporation of Main Contract Provisions brings in the relevant terms of the main contract. Subcontract Sum fixes the lump sum. Programme, Commencement and Completion sets the timing. Site Access, Possession and Coordination of Trades covers working alongside others. Health, Safety and Environmental Obligations sets the site rules. Payment Applications, Pay-When-Paid and Retention sets how and when the subcontractor is paid. Variations and Instructions covers changes. Delay, Extensions of Time and Pass-Down of Liquidated Damages passes delay damages down. Defects Liability Period and Remedial Obligations requires defects to be fixed. Indemnities and Limitation of Liability, Insurance Requirements, Assignment, Sub-Subcontracting and Termination, Governing Law and Dispute Resolution and General Provisions complete it.

Fill in the project, the trade package, the drawings and specifications, the lump sum, the programme dates and the defects period. Give the subcontractor copies of the main contract terms you incorporate. The governing law is deliberately left blank, so the agreement can be adapted to your country.

It is a template, not legal advice.

CONSTRUCTION SUBCONTRACTOR AGREEMENT

This Construction Subcontractor Agreement (the "Agreement") is made and entered into as of [Effective Date] (the "Effective Date") by and between:

[Main Contractor legal name], a [type of entity] organized and existing under the laws of [jurisdiction], having its registered office at [address] and registration number [number] (the "Contractor"); and

[Subcontractor legal name], a [type of entity] organized and existing under the laws of [jurisdiction], having its registered office at [address] and registration number [number] (the "Subcontractor").

The Contractor and the Subcontractor are each referred to as a "Party" and together as the "Parties".

The Contractor has entered into a contract dated [Main Contract date] (the "Main Contract") with [Employer legal name] (the "Employer") for the design and/or construction of [description of project] at [Site address] (the "Project").

The Contractor wishes to engage the Subcontractor to execute certain trade works forming part of the Project, and the Subcontractor has represented that it possesses the skill, resources, licenses, experience and capacity to perform such works in accordance with this Agreement, and the Contractor has relied upon that representation in entering into this Agreement.

The Parties therefore agree as set out in the following provisions.

  1. Definitions and Interpretation

    1. In this Agreement, the following terms have the meanings set out below, unless the context otherwise requires.

    2. "Applicable Law" means all laws, statutes, regulations, codes, orders, by-laws and mandatory requirements of any competent authority in force from time to time and applicable to the Subcontract Works, the Site or either Party, including building, safety, labor and environmental requirements.

    3. "Business Day" means a day other than a Saturday, a Sunday or a public holiday in [jurisdiction/place of the Site].

    4. "Completion Date" means the date or dates stated in the Programme, as extended in accordance with this Agreement, by which the Subcontract Works or any section of them must be completed.

    5. "Defects Liability Period" means the period of [number] months commencing on the date of issue of the Contractor's written certificate of completion of the Subcontract Works, or, if later, such period as the Main Contract requires in respect of the Subcontract Works, whichever is longer.

    6. "Drawings and Specifications" means the drawings, specifications, schedules, standards, performance requirements and other technical documents identified or referred to in clause 2 of this Agreement, as revised or issued from time to time in accordance with this Agreement.

    7. "Main Contract Delay Damages" means any liquidated damages, delay damages, penalties or equivalent sums, howsoever described, that are or become payable by the Contractor to the Employer under the Main Contract.

    8. "Programme" means the programme for the Subcontract Works prepared by the Subcontractor, approved by the Contractor and aligned with the Main Contract programme, as updated from time to time in accordance with this Agreement.

    9. "Retention" means the percentage of each sum otherwise due to the Subcontractor that the Contractor is entitled to withhold pursuant to this Agreement.

    10. "Site" means the land and buildings on, in, over or under which the Project is to be carried out, together with any other places made available by the Contractor for the Subcontract Works.

    11. "Subcontract Sum" means the fixed lump sum stated in this Agreement, as adjusted only in accordance with its express terms.

    12. "Subcontract Works" means the trade works described in this Agreement, including all labor, materials, plant, equipment, supervision, temporary works, testing, documentation and other things necessary to complete them, together with any variations instructed under this Agreement.

    13. "Variation" means any addition to, omission from, or change in the quality, quantity, character, timing, sequence or method of the Subcontract Works, instructed or approved in writing by the Contractor.

    14. Headings are for convenience only and do not affect interpretation. Words in the singular include the plural and vice versa. The words "including" and "includes" are not words of limitation. References to "writing" include email where expressly permitted for notices. References to a clause or section are to a clause or section of this Agreement. Where the Agreement and the Main Contract Provisions conflict, the provision imposing the more onerous obligation on the Subcontractor shall prevail, unless the Contractor directs otherwise in writing.

    15. The Subcontractor acknowledges that time is of the essence in respect of each Completion Date and that its obligations under this Agreement are material to the Contractor's performance of the Main Contract.

  2. Subcontract Works, Drawings and Specifications

    1. The Subcontractor shall carry out and complete the Subcontract Works, being [detailed description of trade works, including scope, locations, levels and zones], in a proper, workmanlike and timely manner, with due skill, care and diligence, and in accordance with this Agreement.

    2. The Subcontract Works shall be executed in accordance with the Drawings and Specifications, being those identified as [list or description of drawings, drawing numbers and revisions] and [list or description of specifications, standards and performance requirements]. The Subcontractor confirms that it has examined them and is satisfied that they are sufficient for the purposes of pricing and executing the Subcontract Works.

    3. The Subcontractor shall use only new materials and goods of good quality, free from defects, conforming to the Drawings and Specifications, and, where the Drawings and Specifications are silent, suitable for their intended purpose and consistent with good industry practice. The Contractor may require samples, test certificates and evidence of origin, and may reject any non-conforming materials or workmanship by notice.

    4. The Subcontractor shall promptly notify the Contractor in writing of any discrepancy, ambiguity, error, omission or inconsistency discovered in the Drawings and Specifications or between them and Applicable Law, and shall not proceed with the affected work until it has received the Contractor's written direction, save where necessary for safety.

    5. Where any design is included within the Subcontract Works, being [description of Subcontractor design responsibility, if any], the Subcontractor shall carry out such design with the skill and care of a competent design professional, shall submit design documents to the Contractor for review within the time stated in the Programme, and shall remain solely responsible for the design notwithstanding any review, comment or approval by the Contractor or the Employer.

    6. The Subcontractor shall retain responsibility for setting out the Subcontract Works, shall verify dimensions and levels on the Site, and shall supply as-built drawings, operation and maintenance manuals, warranties and other close-out documents as required by the Main Contract, within [number] days of completion.

    7. The Subcontractor shall keep a complete set of current Drawings and Specifications on the Site and shall not use superseded documents. The Contractor does not warrant the accuracy of any information supplied by the Employer or third parties, except to the extent the Main Contract entitles the Contractor to recover corresponding relief from the Employer and then only to the extent actually recovered.

  3. Incorporation of Main Contract Provisions

    1. The Subcontractor acknowledges that it has been given the opportunity to inspect, and has inspected or has had the opportunity to inspect, the documents comprising the Main Contract, other than any pricing information of the Contractor which is confidential, including the provisions identified as [list of Main Contract clauses, documents or parts made available] (the "Main Contract Provisions").

    2. The Subcontractor shall perform the Subcontract Works so as to enable the Contractor to comply with its obligations under the Main Contract. The Subcontractor shall observe, perform and be bound to the Contractor by all obligations, restrictions and liabilities that the Contractor owes to the Employer under the Main Contract insofar as they relate to the Subcontract Works, as if the Subcontractor were the Contractor and the Contractor were the Employer.

    3. The Subcontractor shall not do or omit to do anything which would place the Contractor in breach of the Main Contract, or which would entitle the Employer to terminate, suspend or withhold payment under the Main Contract, and shall indemnify the Contractor against any loss, liability or cost arising from any such act or omission.

    4. The Contractor shall have against the Subcontractor all rights, remedies, powers and entitlements that the Employer has against the Contractor under the Main Contract in respect of the Subcontract Works. The Subcontractor shall have only those rights against the Contractor expressly granted by this Agreement, and shall be entitled to relief under the Main Contract only to the extent that the Contractor actually obtains corresponding relief from the Employer in respect of the Subcontract Works.

    5. Time limits for notices, claims, submissions and responses under the Main Contract that are applicable to the Subcontract Works shall apply to the Subcontractor, save that the Subcontractor's time limits shall expire [number] Business Days before the corresponding Main Contract time limit, or, where such period is not practicable, at such earlier time as allows the Contractor reasonably to comply with the Main Contract.

    6. Where the Main Contract Provisions provide for the Employer, its representative or any adjudicating or certifying person to make a decision, certification, instruction or determination, such decision shall be binding on the Subcontractor to the same extent that it binds the Contractor, without prejudice to the Contractor's rights to dispute it with the Employer at its discretion and at the Subcontractor's cost where it concerns the Subcontract Works.

    7. The Subcontractor shall, at the Contractor's request and at the Subcontractor's cost, provide all information, documents, witnesses and assistance reasonably required for the Contractor to pursue or defend any claim or dispute under the Main Contract in relation to the Subcontract Works.

  4. Subcontract Sum

    1. In consideration of the due and complete performance of the Subcontract Works, the Contractor shall pay the Subcontractor the fixed lump sum of [amount in figures and words] [currency] (the Subcontract Sum), subject to the terms of this Agreement.

    2. The Subcontract Sum is a fixed lump sum price and is not subject to remeasurement. It is inclusive of all labor, materials, plant, equipment, supervision, overheads, profit, temporary works, transport, storage, waste removal, insurance premiums, fees, duties, levies and all other costs of whatever nature necessary to carry out and complete the Subcontract Works, excluding only any value-added, sales or similar tax which is separately chargeable by law and shown on a valid invoice.

    3. The Subcontract Sum is not subject to adjustment for fluctuations in the cost of labor, materials, plant or any other item, nor for any error or omission in the Subcontractor's estimate or any misunderstanding of the Subcontract Works, the Drawings and Specifications or the Site conditions, save as expressly provided in the clause concerning Variations.

    4. The Subcontractor warrants that it has made full allowance in the Subcontract Sum for all risks, contingencies and obligations under this Agreement, including those arising from the Main Contract Provisions, the physical conditions of the Site that could reasonably have been foreseen from inspection, and the sequencing and coordination of work with other trades.

    5. The Subcontract Sum shall be allocated across the Subcontract Works in accordance with a breakdown of [schedule of values or price breakdown to be provided by the Subcontractor and approved by the Contractor], which shall be used for valuing interim payments. Such breakdown shall not be construed as a measurement contract.

    6. The Contractor may set off against the Subcontract Sum or any other sum due to the Subcontractor any amount that the Subcontractor owes the Contractor under this Agreement or any other arrangement, including Main Contract Delay Damages passed down, the cost of remedying defects, and any other debt or damages due to the Contractor.

    7. Each Party shall be responsible for its own taxes. The Subcontractor shall comply with all tax registration, reporting and withholding obligations and shall provide such tax certificates and evidence as the Contractor may reasonably require. The Contractor may deduct any amounts that Applicable Law requires it to withhold from payments to the Subcontractor.

  5. Programme, Commencement and Completion

    1. The Subcontractor shall commence the Subcontract Works on [commencement date] or such other date as the Contractor may notify in writing (the "Commencement Date"), and shall proceed regularly, diligently and without delay in accordance with the Programme.

    2. The Subcontractor shall complete the Subcontract Works, and each section of them, by the relevant Completion Date, being [Completion Date for the whole of the Subcontract Works] and, for any sections, [section dates and descriptions].

    3. Within [number] days of the Effective Date, the Subcontractor shall submit a detailed Programme showing the sequence, duration, key milestones, resources, procurement lead times and interfaces with other trades for the Subcontract Works. The Programme shall be subject to the Contractor's approval and shall be consistent with the Main Contract programme. The Subcontractor shall comply with any reasonable revision directed by the Contractor to accommodate the Main Contract programme.

    4. The Subcontractor shall update the Programme at intervals of not more than [number] days, and promptly whenever progress is or is likely to be behind schedule. The Subcontractor shall notify the Contractor immediately of any event likely to delay the Subcontract Works and shall at its own cost take all measures necessary to recover lost time, including additional labor, overtime and extended working hours, unless entitled to an extension of time.

    5. The Contractor may by notice require the Subcontractor to accelerate, resequence or re-phase the Subcontract Works to meet the Main Contract programme. Where acceleration is required for reasons other than the Subcontractor's default or a matter for which the Subcontractor is not entitled to an extension of time, the Contractor shall pay such additional sum as is agreed in writing or, absent agreement, as is reasonably determined by the Contractor, but only to the extent that the Contractor recovers equivalent sums from the Employer.

    6. Completion of the Subcontract Works shall occur only when the Contractor has certified in writing that the Subcontract Works are complete in accordance with this Agreement, subject to the minor outstanding items identified by the Contractor, and that all required testing, commissioning and close-out documentation have been delivered. Taking over or use of any part of the Subcontract Works by the Employer or the Contractor shall not constitute acceptance of defective work.

    7. The Subcontractor shall attend progress meetings convened by the Contractor at the intervals of [frequency] and shall provide written progress reports in the form required by the Contractor.

  6. Site Access, Possession and Coordination of Trades

    1. The Contractor shall give the Subcontractor access to those parts of the Site necessary for the Subcontract Works at the times stated in the Programme, subject to the Contractor's own access rights under the Main Contract. Access shall be non-exclusive, and the Subcontractor shall not be deemed to have possession of the Site or any part of it.

    2. The Contractor may require the Subcontractor to share access, working areas, hoists, scaffolding, welfare facilities and temporary services with the Contractor and other trades on the Site, and the Subcontractor shall cooperate and coordinate its work with them so as not to impede, delay or damage the work of others. The Contractor's directions in respect of coordination shall be binding on the Subcontractor.

    3. The Subcontractor shall inspect any work or area on which its work depends before commencing work, and shall notify the Contractor in writing of any defect or unsuitability therein. Commencement of work shall be deemed acceptance that such preceding work or area is suitable, except for defects which could not have been discovered upon reasonable inspection.

    4. The Subcontractor shall keep the areas in which it works clean and tidy, shall remove its debris and surplus materials regularly, and shall be responsible for the security, protection and storage of its own materials, plant, tools and equipment on the Site. The Contractor shall have no liability for loss of or damage to such items, however caused, except to the extent caused by the Contractor's gross negligence or willful misconduct.

    5. The Subcontractor shall comply with all Site rules, access control procedures, working hours, delivery schedules and logistics requirements notified by the Contractor or the Employer. The Subcontractor shall ensure that its personnel carry required identification and have completed Site induction.

    6. The Contractor may remove from the Site any person employed by the Subcontractor who, in the Contractor's reasonable opinion, is incompetent, negligent, unsafe or in breach of Site rules, and the Subcontractor shall promptly replace such person at its own cost, without any entitlement to an extension of time or additional payment.

    7. Where the Subcontractor requires additional access or facilities not stated in the Programme, it shall request them in writing not less than [number] days in advance, and the Contractor shall use reasonable endeavors, but shall not be obliged, to accommodate the request.

  7. Health, Safety and Environmental Obligations

    1. The Subcontractor shall comply with all Applicable Law, the Main Contract Provisions, the Contractor's health and safety plan and Site rules relating to health, safety, welfare and the environment, and shall perform the Subcontract Works in a manner that safeguards persons and property.

    2. The Subcontractor shall, before commencing work, submit to the Contractor a risk assessment, method statement and safety plan specific to the Subcontract Works, for the Contractor's review, and shall not commence the relevant activities until they are accepted. Acceptance does not relieve the Subcontractor of its responsibility.

    3. The Subcontractor shall ensure that all of its personnel are suitably qualified, trained, certified, competent and, where necessary, licensed for the tasks assigned, and shall maintain records of training and certification available for inspection by the Contractor. The Subcontractor shall provide and enforce the use of appropriate personal protective equipment.

    4. The Subcontractor shall immediately notify the Contractor of any accident, injury, near miss, dangerous occurrence, illness or environmental incident arising from the Subcontract Works, shall provide a written report within [number] hours, and shall cooperate fully in any investigation by the Contractor, the Employer or any authority.

    5. The Subcontractor shall handle, store, use and dispose of all hazardous substances and waste in accordance with Applicable Law and the Contractor's environmental management requirements, shall prevent pollution, nuisance, noise and dust to the extent reasonably practicable, and shall be liable for any contamination or environmental harm it causes.

    6. The Contractor may at any time stop any work of the Subcontractor which in the Contractor's opinion is unsafe or non-compliant. Any resulting delay or cost shall be borne by the Subcontractor and shall not entitle it to an extension of time or additional payment.

    7. The Subcontractor shall bear all fines, penalties, costs and losses incurred by the Contractor as a result of the Subcontractor's breach of this clause, and shall ensure that any lower-tier subcontractor and supplier is bound by equivalent obligations.

  8. Payment Applications, Pay-When-Paid and Retention

    1. The Subcontractor shall submit to the Contractor, on or before the [day] day of each month (or such other date as the Contractor notifies to align with the Main Contract), an application for payment for the Subcontract Works properly carried out up to the end of the preceding period, in the form required by the Contractor, with the breakdown specified under this Agreement and supporting documents including delivery records, test results, and any lien waivers or equivalent releases.

    2. The Contractor shall review each application and shall notify the Subcontractor of the amount it considers due, with reasons for any difference, within [number] Business Days of receipt. The Contractor may adjust the amount to reflect work not carried out or not compliant with this Agreement, deductions, set-offs, Retention, and amounts previously paid.

    3. Payment is conditional upon receipt by the Contractor of the corresponding payment from the Employer. The Contractor shall be obliged to pay the Subcontractor any amount certified or notified as due to it only within [number] Business Days after the Contractor has received from the Employer payment in cleared funds of the sum that includes or relates to the Subcontractor's work (a "Pay-When-Paid" condition). The Subcontractor acknowledges that it has assumed the risk of the Employer's non-payment, late payment or insolvency, and that such risk is reflected in the Subcontract Sum. Where the Employer pays only part of a sum attributable to the Subcontract Works, the Contractor shall be obliged to pay only the proportionate part of the amount due to the Subcontractor. This clause shall apply to the fullest extent permitted by Applicable Law and, where Applicable Law limits its operation, shall apply to the maximum extent so permitted.

    4. The Contractor shall retain [3] percent of the gross value of each interim payment due to the Subcontractor (the Retention). The Retention shall be held by the Contractor, shall not be required to be held in a separate account, and shall not bear interest in favor of the Subcontractor. The Retention shall be released to the Subcontractor within [number] days after the expiry of the Defects Liability Period and the issue of the Contractor's written confirmation that all defects notified have been remedied, subject to the Contractor's rights of set-off and to receipt of the corresponding retention from the Employer, where applicable.

    5. The Contractor may deduct from the Retention and any payment any sum due or reasonably estimated to become due from the Subcontractor, including the cost of remedying defects, Main Contract Delay Damages, and costs arising from the Subcontractor's default. If the Retention is insufficient, the Subcontractor shall pay the shortfall on demand.

    6. No payment shall constitute acceptance of the Subcontract Works or a waiver of any right of the Contractor. The Contractor may correct any previous payment, and the Subcontractor shall repay any overpayment within [number] days of demand.

    7. Final payment shall become due only after completion of the Subcontract Works, the expiry of the Defects Liability Period, delivery of all close-out documents, and the submission of a final account, a final release of all claims and evidence of payment of all lower-tier subcontractors and suppliers. Any claim not included in the final account shall be waived.

  9. Variations and Instructions

    1. The Contractor may at any time, by written instruction, order a Variation. The Subcontractor shall carry out each Variation, and no variation shall invalidate this Agreement. The Subcontractor shall not vary the Subcontract Works without the Contractor's prior written instruction.

    2. The Subcontractor shall comply with all written instructions of the Contractor relating to the Subcontract Works, including instructions given by the Employer or its representative and passed on by the Contractor. Oral instructions shall be confirmed in writing by the Contractor, but the Subcontractor shall comply with them, and shall confirm them in writing within [number] Business Days if the Contractor has not done so.

    3. Within [number] Business Days of receiving an instruction that the Subcontractor considers to be a Variation, and in any event before carrying out the work, the Subcontractor shall give written notice, together with a detailed quotation setting out the cost and time implications on a basis consistent with the rates in the breakdown of the Subcontract Sum, or, where no rate applies, on a fair and reasonable basis excluding unsupported markups. Failure to give timely notice shall constitute a waiver of any entitlement to adjustment in the Subcontract Sum or time.

    4. The value of a Variation shall be agreed in writing by the Parties before it is carried out or, if not agreed, determined by the Contractor acting reasonably, and shall in any case not exceed the amount that the Contractor recovers from the Employer in respect of the corresponding change. Omissions shall be valued at the rates in the Subcontractor's breakdown, with a proportionate adjustment of the Contractor's costs and profit.

    5. No Variation shall be valid, and no payment shall be due in respect of any change, unless instructed or approved in writing by an authorized representative of the Contractor, identified as [name and title of authorized person]. Work carried out without such instruction shall be at the Subcontractor's own risk and cost, and the Contractor may require its removal and reinstatement.

    6. Where a Variation affects the Programme, the Subcontractor's entitlement to an extension of time shall be determined under the clause concerning delay and extensions of time, and not otherwise.

  10. Delay, Extensions of Time and Pass-Down of Liquidated Damages

    1. If the Subcontractor becomes aware that the Subcontract Works are being or are likely to be delayed, it shall notify the Contractor in writing within [number] days, stating the cause, the anticipated duration and the affected activities, and shall continue to notify the Contractor of developments and provide updated information.

    2. The Subcontractor shall be entitled to an extension of time only to the extent that (a) the delay is caused by a Variation or by an act, omission or breach of the Contractor, or by another event which entitles the Contractor to an extension of time under the Main Contract in respect of the Subcontract Works; (b) the delay affects the critical path of the Programme; (c) the Subcontractor has complied with the notice requirements of this Agreement and has used all reasonable endeavors to mitigate the delay; and (d) the Contractor has received a corresponding extension of time from the Employer in respect of the Subcontract Works. The extension of time to which the Subcontractor is entitled shall not exceed that obtained by the Contractor from the Employer, and shall be the Subcontractor's sole remedy for such delay, save where this Agreement expressly provides for payment.

    3. The Subcontractor shall not be entitled to any additional payment, loss, expense or damages in respect of delay or disruption except to the extent that the Contractor recovers a corresponding sum from the Employer for the Subcontract Works, and then only to the extent that such sum is attributable to the Subcontractor's loss.

    4. If the Subcontractor fails to complete the Subcontract Works or any section by the relevant Completion Date, as extended, the Subcontractor shall pay or allow to the Contractor liquidated damages at the rate of [amount] per day of delay or, if greater, a sum equal to the full amount of the Main Contract Delay Damages attributable to the delay and which the Contractor incurs or becomes liable to pay to the Employer as a result of the delay caused by the Subcontractor.

    5. The Subcontractor acknowledges that the Main Contract Delay Damages are passed down in full, and that the Contractor may recover from the Subcontractor the whole of the Main Contract Delay Damages, including any that arise from the combined effect of the Subcontractor's delay and that of others, to the extent the Subcontractor's delay contributed to the Contractor's liability, together with any further direct loss, cost and expense, including prolongation costs, that the Contractor suffers by reason of such delay.

    6. The Parties agree that the sums payable under this clause are a genuine pre-estimate of the Contractor's loss, are not penalties, and are proportionate to the legitimate interest of the Contractor in the timely completion of the Subcontract Works. The Contractor may deduct them from any sum due to the Subcontractor. Payment of such damages shall not relieve the Subcontractor from its obligation to complete the Subcontract Works.

    7. If the Main Contract Delay Damages are reduced, waived or refunded, the Contractor shall credit the Subcontractor with the proportionate part attributable to the Subcontractor, after deduction of the Contractor's costs of obtaining such reduction.

  11. Defects Liability Period and Remedial Obligations

    1. The Defects Liability Period shall apply to the Subcontract Works and each section of them. During the Defects Liability Period, and at any time thereafter in respect of latent defects to the extent permitted by Applicable Law, the Subcontractor shall at its own cost promptly remedy any defect, shrinkage, fault or other non-conformity in the Subcontract Works that arises from materials, workmanship, design or other failure to comply with this Agreement.

    2. The Contractor may notify the Subcontractor of any defect at any time during the Defects Liability Period, and the Subcontractor shall begin remedial work within [number] days (or within 24 hours in case of emergency) of the notice and complete it within a period reasonably specified by the Contractor and consistent with the Main Contract, at times that minimize interference with the Project or the Employer's use of the premises.

    3. If the Subcontractor fails to commence or complete remedial work as required, the Contractor may, without prejudice to its other rights, carry out the work itself or employ others to do so, and the Subcontractor shall pay on demand all costs and expenses reasonably incurred, plus an administrative charge of [percentage] percent. Such costs may be deducted from the Retention or any other sum due.

    4. The Subcontractor shall also bear the cost of any investigation, testing, opening-up, making good, and the correction of other works damaged by the defect or by the remedial work. Where defective work is a result of a design or product failure, the Subcontractor shall, at the Contractor's request, replace similar work throughout the Project where the same defect is reasonably likely to occur.

    5. Remedied work shall be subject to a new Defects Liability Period of [number] months from the date of completion of the remedial work, provided that the total additional period shall not exceed [number] months beyond the original expiry date, or such period as the Main Contract requires.

    6. The Subcontractor shall assign or procure for the Contractor the benefit of all manufacturers' and suppliers' warranties and guarantees relating to materials, plant and equipment, and shall deliver them with the close-out documents. Such warranties shall be in addition to, and not in substitution for, the Subcontractor's obligations in this clause.

    7. Where the Contractor is not entitled to recover from the Employer in respect of a defect because of the Subcontractor's failure to give any warranty or comply with the Main Contract Provisions, the Subcontractor shall be liable for all resulting loss.

  12. Indemnities and Limitation of Liability

    1. The Subcontractor shall indemnify, defend and hold harmless the Contractor, the Employer and their respective officers, directors, employees, agents and affiliates (the "Indemnified Parties") from and against all claims, demands, liabilities, losses, damages, costs and expenses, including reasonable legal fees, arising out of or in connection with: (a) death of or injury to any person; (b) loss of or damage to any property; (c) any breach of this Agreement or of the Main Contract Provisions by the Subcontractor; (d) any negligence, willful misconduct or violation of Applicable Law by the Subcontractor or its personnel, lower-tier subcontractors or suppliers; and (e) any infringement of intellectual property rights arising from the Subcontract Works.

    2. The Subcontractor's indemnity shall be reduced proportionately only to the extent that the relevant loss was caused by the negligence or willful misconduct of an Indemnified Party, and only to the extent permitted by Applicable Law.

    3. The Subcontractor shall be solely responsible for the acts and omissions of its employees, agents, lower-tier subcontractors and suppliers, as if they were its own. The Subcontractor shall pay all wages, benefits, taxes and contributions of its personnel, and shall indemnify the Contractor against any claim by such personnel or any authority in that regard.

    4. The Subcontractor shall keep the Site and the Subcontract Works free of liens, encumbrances and claims by its lower-tier subcontractors and suppliers, and shall discharge or bond off any such lien within [number] days of notice, failing which the Contractor may do so and recover the cost from the Subcontractor.

    5. The Contractor's aggregate liability to the Subcontractor arising out of or in connection with this Agreement, whether in contract, tort (including negligence), breach of statutory duty or otherwise, shall not exceed the lesser of (a) the portion of the Subcontract Sum properly due and unpaid for work performed, and (b) [amount or percentage of Subcontract Sum]. The Contractor shall not in any circumstances be liable for loss of profit, loss of revenue, loss of opportunity, loss of use, loss of goodwill or any indirect or consequential loss.

    6. The Subcontractor's liability under this Agreement shall not be limited, save that its liability for indirect or consequential loss, other than the Main Contract Delay Damages and any loss that the Contractor is liable to pay to the Employer under the Main Contract, shall be limited to [amount or percentage of Subcontract Sum]. Nothing in this Agreement limits or excludes liability for death, personal injury, fraud, willful misconduct, or any liability that cannot be limited under Applicable Law.

    7. The indemnities in this Agreement shall survive completion, expiry or termination of this Agreement.

  13. Insurance Requirements

    1. The Subcontractor shall, at its own cost, effect and maintain with reputable insurers of good financial standing, acceptable to the Contractor, from the Commencement Date until the end of the Defects Liability Period (and for completed operations coverage for a further period of [number] years), the insurances set out in this clause.

    2. Commercial general or public liability insurance covering liability for injury to persons and damage to property, with a limit of not less than [amount] for any one occurrence and [amount] in the aggregate, including cover for products and completed operations, and containing a cross-liability or severability of interests provision.

    3. Workers' compensation or employer's liability insurance as required by Applicable Law, with a limit of not less than [amount], covering all employees and personnel engaged in the Subcontract Works.

    4. Professional indemnity insurance, where the Subcontract Works include design, with a limit of not less than [amount] for each claim, maintained for not less than [number] years following completion, and motor vehicle liability insurance and contractor's plant and equipment insurance for the full replacement value of the Subcontractor's equipment, with the insurer's waiver of subrogation against the Contractor.

    5. The Subcontractor shall ensure that the Contractor and the Employer are named as additional insureds on the liability policies, and that the policies are primary and non-contributory, and provide for not less than [number] days' prior written notice to the Contractor of cancellation, material change or non-renewal.

    6. The Subcontractor shall provide certified copies of the policies and certificates of insurance before the Commencement Date and upon each renewal, and in any case within [number] days of request. The Subcontractor shall comply with the insurance requirements of the Main Contract insofar as applicable to the Subcontract Works and shall not do anything to invalidate any policy of insurance maintained by the Contractor or the Employer.

    7. If the Subcontractor fails to maintain any required insurance, the Contractor may procure it and recover the premium from the Subcontractor, and the Subcontractor shall bear all losses that would have been covered. The Subcontractor shall be responsible for all deductibles and self-insured retentions, and the limits of insurance shall not limit its liability under this Agreement.

  14. Assignment, Sub-Subcontracting and Termination

    1. The Subcontractor shall not assign, transfer, charge or otherwise dispose of the whole or any part of this Agreement or any benefit or interest under it, including the right to receive payment, without the prior written consent of the Contractor. The Contractor may assign, novate or transfer its rights and obligations under this Agreement, in whole or in part, to the Employer, to any financier, to any affiliate or to any successor to the Main Contract, without the consent of the Subcontractor, and the Subcontractor shall execute any document reasonably required for that purpose.

    2. The Subcontractor shall not subcontract any part of the Subcontract Works without the prior written consent of the Contractor, which may be given subject to conditions or withheld in its discretion. Any consent shall not relieve the Subcontractor of any liability, and the Subcontractor shall remain liable for the acts and defaults of its lower-tier subcontractors as if they were its own. Each approved sub-subcontract shall incorporate terms consistent with this Agreement, including the Pay-When-Paid provisions, and shall be assignable to the Contractor upon termination.

    3. The Contractor may terminate this Agreement, or the Subcontractor's employment under it, by written notice with immediate effect if the Subcontractor: (a) fails to commence or proceed with the Subcontract Works regularly and diligently; (b) fails to remedy a breach within [number] days after notice; (c) breaches the clauses concerning health and safety, insurance, assignment or sub-subcontracting; (d) becomes insolvent, bankrupt, enters into any arrangement with creditors, has a receiver or administrator appointed, or ceases business; (e) is in breach of Applicable Law in a material respect; or (f) commits an act of corruption, fraud or willful misconduct.

    4. The Contractor may also terminate this Agreement in whole or in part if the Main Contract is terminated or if the Subcontract Works are omitted from or cease to be required under the Main Contract, or for convenience upon not less than [number] days' written notice. In the case of termination for convenience or for the termination of the Main Contract without fault of the Subcontractor, the Subcontractor shall be paid the value of work properly executed to the date of termination and reasonable demobilization costs directly incurred, subject to the Pay-When-Paid provisions, and shall have no claim for loss of profit or any other loss.

    5. Upon termination for the Subcontractor's default, the Contractor may take possession of the Subcontract Works, materials, plant and equipment on the Site, use them to complete the Subcontract Works, employ others to do so, and recover from the Subcontractor all costs and losses incurred, including the excess cost of completion above the unpaid balance of the Subcontract Sum. No further payment shall be due to the Subcontractor until the Subcontract Works are completed and the final account is determined.

    6. The Subcontractor may suspend or terminate the performance of its obligations only if the Contractor fails to pay an undisputed sum which is due and payable under this Agreement within [number] days after the Subcontractor's written notice of default, and only to the extent permitted by Applicable Law and subject to the Pay-When-Paid provisions, and the Subcontractor shall in any event continue to perform its obligations in relation to safety and protection of the Site.

    7. Upon termination or expiry, the Subcontractor shall promptly remove its personnel, plant and equipment from the Site, deliver all documents, drawings and records relating to the Subcontract Works, and assign to the Contractor the benefit of any supply or lower-tier agreements that the Contractor elects to take over. Termination shall not affect any accrued rights or liabilities, nor those provisions intended to survive.

  15. Governing Law and Dispute Resolution

    1. This Agreement and any dispute or claim arising out of or in connection with it, including non-contractual disputes, shall be governed by and construed in accordance with the laws of [governing law jurisdiction].

    2. The Parties shall first attempt to resolve any dispute arising out of or in connection with this Agreement by good faith negotiation between senior representatives, commencing upon written notice of the dispute (a "Dispute Notice"). If the dispute is not resolved within [number] days of the Dispute Notice, either Party may refer it for mediation or the next stage under this clause.

    3. Where a dispute under this Agreement relates to or is substantially the same as a dispute under the Main Contract, the Subcontractor agrees that, at the Contractor's election, the dispute shall be consolidated or heard together with, or stayed pending, the resolution of the Main Contract dispute, and the Subcontractor shall be bound by the outcome of such Main Contract proceedings, including any decision, award or judgment, to the extent it concerns the Subcontract Works. The Subcontractor shall participate in such proceedings as the Contractor reasonably requests.

    4. Any dispute not resolved by negotiation shall be referred to and finally resolved by [arbitration under the rules of [arbitral institution] by [number] arbitrator(s) / the courts of [jurisdiction]], and the seat or place of proceedings shall be [city and country]. The language of the proceedings shall be English. The award or judgment shall be final and binding on the Parties, and judgment upon it may be entered in any court of competent jurisdiction.

    5. Where Applicable Law grants a right to refer a dispute to interim or adjudication proceedings, the Parties shall comply with any such decision on an interim basis pending final determination, and each Party shall bear its own costs of such proceedings unless the decision-maker orders otherwise.

    6. The Subcontractor shall continue to perform its obligations under this Agreement, and the Contractor shall continue to pay undisputed sums, pending the resolution of any dispute. Nothing in this clause prevents either Party from seeking urgent injunctive or interim relief from a court of competent jurisdiction.

    7. The prevailing Party in any dispute resolution proceedings shall be entitled to recover its reasonable legal fees and costs from the other Party, as determined by the tribunal or court.

  16. General Provisions

    1. This Agreement, together with the Main Contract Provisions incorporated by it, constitutes the entire agreement between the Parties with respect to its subject matter and supersedes all prior negotiations, representations, proposals, understandings and agreements, whether oral or written. Each Party acknowledges that it has not relied on any statement not set out in this Agreement.

    2. No amendment to this Agreement shall be effective unless made in writing and signed by authorized representatives of both Parties. No waiver of any right or remedy shall be effective unless in writing and signed by the waiving Party, and no failure or delay in exercising any right shall operate as a waiver of it.

    3. If any provision of this Agreement is held to be invalid, illegal or unenforceable, such provision shall be modified to the minimum extent necessary to make it enforceable, or severed, and the remaining provisions shall continue in full force and effect.

    4. All notices under this Agreement shall be in writing and delivered by hand, by recognized courier, or by email with confirmation of transmission, to the addresses stated in the execution section of this Agreement, or such other address as a Party notifies. A notice shall be deemed received on delivery if by hand or courier, and on the next Business Day after transmission if by email.

    5. The Subcontractor shall keep confidential all information relating to the Project, the Main Contract, the Employer and the Contractor, and shall not disclose or use such information except as necessary for the performance of this Agreement or as required by Applicable Law. This obligation shall survive termination. The Subcontractor shall not make any publicity or public statement concerning the Project without the Contractor's prior written consent.

    6. The Subcontractor shall comply with all anti-bribery, anti-corruption, sanctions, competition and modern slavery requirements of Applicable Law and the Main Contract, and shall maintain the policies and records necessary to demonstrate compliance. The Subcontractor is an independent contractor, and nothing in this Agreement creates a partnership, joint venture, agency or employment relationship between the Parties.

    7. Neither Party shall be liable for a failure to perform its obligations, other than payment obligations, to the extent caused by an event beyond its reasonable control that could not have been avoided by reasonable precautions, provided that relief for the Subcontractor shall be limited to that provided in the clause concerning delay and extensions of time. The rights and remedies of the Contractor under this Agreement are cumulative and in addition to those provided by law.

    8. This Agreement may be executed in counterparts, including by electronic signature, each of which shall be deemed an original and all of which together constitute one instrument.

The Parties have executed this Agreement through their duly authorized representatives as of the Effective Date.

CONTRACTOR: [Main Contractor legal name]

Signature: [signature]

Name: [authorized signatory name]

Title: [title]

Date: [date]

Address for notices: [address]

Email for notices: [email]

Attention: [contact person]

SUBCONTRACTOR: [Subcontractor legal name]

Signature: [signature]

Name: [authorized signatory name]

Title: [title]

Date: [date]

Address for notices: [address]

Email for notices: [email]

Attention: [contact person]

Subcontractor registration and license number: [number]

Subcontractor tax identification number: [number]