Simple Subcontractor Agreement Template
This simple subcontractor agreement is a contractor-friendly agreement written in plain English for a main contractor that hires a subcontractor to deliver part of a client project. The work is done for a fixed price, and the subcontractor is paid only if the client pays the main contractor. The subcontractor's liability is not capped, the client's requirements flow down to the subcontractor, disputes are joined with the dispute process under the main contract, and the subcontract ends automatically if the main contract ends.
Use it when you pass part of a client contract to a specialist and want to make sure you are never paying out money you have not received, or carrying risks the subcontractor should bear.
The agreement has 11 short sections. Definitions and Key Terms explains the words used. Scope of the Subcontracted Work describes the work. Schedule and Delivery sets the deadlines. Price and Pay-If-Paid Payment Terms fixes the price and makes payment depend on the client. Flow-Down of Client Requirements passes the client's terms to the subcontractor. Changes to the Work explains how changes are agreed. Quality, Inspection, and Defects sets the standard and the duty to fix defects. Insurance and Liability leaves the subcontractor's liability uncapped. Ending the Subcontract ties it to the main contract. Governing Law and Dispute Resolution and General Terms close it.
Fill in the subcontractor, the work, the price, the schedule and the client requirements that apply. Attach or reference the relevant parts of the main contract, since they flow down. The governing law is deliberately left blank, so the agreement can be adapted to your country.
It is a template, not legal advice.
SUBCONTRACTOR AGREEMENT
This Subcontractor Agreement (the "Agreement") is made as of [Effective Date] (the "Effective Date") between:
[Main Contractor legal name], a [entity type] organized under the laws of [jurisdiction], with its principal office at [address] (the "Main Contractor"); and
[Subcontractor legal name], a [entity type] organized under the laws of [jurisdiction], with its principal office at [address] (the "Subcontractor").
The Main Contractor and the Subcontractor are each a "Party" and together the "Parties."
The Main Contractor has entered into a contract with [Client legal name] (the "Client") for [brief description of the project] (the "Project").
The Main Contractor wishes to hire the Subcontractor to perform part of the Project, and the Subcontractor wishes to perform that part, on the terms of this Agreement.
Both Parties are entering into this Agreement for business purposes only.
Definitions and Key Terms
In this Agreement, the following terms have the meanings given below.
"Main Contract" means the agreement dated [date] between the Main Contractor and the Client for the Project, including all documents it incorporates and all changes made to it from time to time.
"Client" means the party identified in the introduction of this Agreement, together with its successors and permitted assigns under the Main Contract.
"Project" means the whole of the work that the Main Contractor has agreed to carry out for the Client under the Main Contract, of which the Work forms a part.
"Work" means the portion of the Project that the Subcontractor is to perform under this Agreement, as described in the section on the scope of the subcontracted work, including all labor, materials, equipment, supervision, and services needed to complete it.
"Deliverables" means everything the Subcontractor must produce, supply, or hand over as part of the Work, including completed work product, materials, documents, drawings, data, and records.
"Subcontract Price" means the fixed price for the Work stated in this Agreement, as adjusted only by a written Change Order.
"Change Order" means a written document signed by an authorized representative of the Main Contractor that changes the scope, price, or schedule of the Work.
"Client Payment" means cleared funds actually received by the Main Contractor from the Client that are paid for or attributable to the Work.
"Client Requirements" means all terms, specifications, standards, rules, and obligations of the Main Contract that relate to the Work, the Project site, or the Subcontractor's conduct, whether or not they are repeated in this Agreement.
"Defect" means any part of the Work or any Deliverable that does not meet this Agreement, the Client Requirements, applicable law, or a good standard of workmanship in the industry, or that is incomplete, faulty, or unfit for its intended purpose.
"Completion Date" means the date by which the Subcontractor must finish the Work, as stated in this Agreement, as adjusted only by a written Change Order.
"Business Day" means any day other than a Saturday, a Sunday, or a public holiday in [jurisdiction].
"Losses" means all losses, damages, liabilities, fines, penalties, costs, and expenses, including reasonable legal fees.
Scope of the Subcontracted Work
The Subcontractor will perform the Work described here: [detailed description of the scope of the Work, including Deliverables, specifications, and the location of performance].
The Subcontractor will provide all labor, supervision, materials, tools, equipment, transport, and other items needed to complete the Work, unless this Agreement says that the Main Contractor will provide a particular item. Items the Main Contractor will provide are: [list of items supplied by the Main Contractor, if any].
The Subcontractor will perform the Work in a professional and workmanlike manner, using properly qualified, trained, and, where required, licensed personnel, and in line with this Agreement, the Client Requirements, and all applicable laws and permits.
The Subcontractor is an independent contractor. Nothing in this Agreement makes the Subcontractor an employee, partner, agent, or joint venturer of the Main Contractor. The Subcontractor is solely responsible for its own personnel, including their pay, taxes, benefits, and safety.
The Subcontractor may not hire any other party to perform any part of the Work without the Main Contractor's prior written consent. If consent is given, the Subcontractor remains fully responsible for the work of that party and must ensure it is bound by terms at least as protective of the Main Contractor as this Agreement.
The Subcontractor has no direct contract with the Client and will not claim anything directly from the Client. The Subcontractor will not communicate with the Client about the Work, price, or disputes except through the Main Contractor, unless the Main Contractor agrees otherwise in writing.
The Subcontractor confirms that it has reviewed the Main Contract documents made available to it, has inspected the Project site where relevant, and has the skills, resources, and capacity to complete the Work for the Subcontract Price.
The Main Contractor's representative for this Agreement is [name and contact details]. The Subcontractor's representative is [name and contact details].
Schedule and Delivery
The Subcontractor will start the Work on [start date] or within [number] days after the Main Contractor's written notice to proceed, whichever the Main Contractor specifies.
The Subcontractor will complete the Work by the Completion Date of [date]. The Parties agree that time is of the essence.
The Subcontractor will also meet these milestones: [list of milestones and dates]. The Subcontractor will keep to the Main Contractor's reasonable schedule for the Project and coordinate its work with the Main Contractor and other contractors.
The Subcontractor will give the Main Contractor written progress reports every [frequency] and will notify the Main Contractor in writing within [number] days after learning of anything likely to delay the Work, stating the cause, the expected length of delay, and the steps being taken to recover.
The Subcontractor is entitled to more time only if the delay is caused by the Main Contractor or the Client, or by an event outside the Subcontractor's reasonable control that could not have been avoided with reasonable care, and only if the Subcontractor gives written notice within [number] days after the delay begins. Any extension must be confirmed in a Change Order. The Subcontractor is not entitled to extra payment for delay unless the Main Contractor actually recovers corresponding compensation from the Client for that delay, and then only to the extent of that recovery attributable to the Subcontractor.
If the Subcontractor fails to meet the Completion Date or a milestone for reasons other than those in the previous clause, the Subcontractor will pay the Main Contractor [amount or rate] for each day of delay as a genuine estimate of the Main Contractor's loss. The Main Contractor may also recover any greater Losses it suffers from delay, including amounts the Client charges the Main Contractor because of the Subcontractor's delay, and may deduct these amounts from any payment due to the Subcontractor.
If the Subcontractor falls behind, the Main Contractor may require it, at its own cost, to add resources or work extra hours to get back on schedule.
The Work is delivered when the Subcontractor has finished it, delivered all Deliverables, and the Main Contractor has accepted it in writing under the section on quality, inspection, and defects.
Price and Pay-If-Paid Payment Terms
The Main Contractor will pay the Subcontractor a fixed price of [amount in currency] for the Work (the Subcontract Price). The Subcontract Price covers everything needed to complete the Work, including labor, materials, equipment, overhead, profit, travel, permits, and all taxes, duties, and charges, other than those the Main Contractor is legally required to pay.
The Subcontract Price will be paid in the following installments: [payment schedule tied to milestones or percentage of completion]. The Subcontractor may invoice only after reaching the relevant milestone and must submit each invoice with the supporting documents the Main Contractor reasonably requires, in the form the Main Contractor specifies.
Payment to the Subcontractor is conditional on payment to the Main Contractor. The Main Contractor is obliged to pay an invoiced amount only after, and only to the extent that, it has received the corresponding Client Payment for the Work covered by that invoice. Receipt of Client Payment is a condition precedent to the Main Contractor's duty to pay, and not merely a matter of timing.
The Main Contractor will pay the Subcontractor within [number] Business Days after it receives the corresponding Client Payment and a correct invoice. The Main Contractor does not promise that the Client will pay, or pay on time. The Subcontractor accepts the risk of the Client's non-payment, late payment, or insolvency, and the Main Contractor will have no liability for any unpaid amount for as long as the Client Payment has not been received.
If the Client does not pay the Main Contractor, the Main Contractor is not required to start legal proceedings against the Client. If the Main Contractor chooses to pursue the Client for an amount that includes sums for the Work, the Subcontractor will reasonably cooperate, and will bear a fair share of the reasonable costs in proportion to its portion of the claim. The Subcontractor will not stop work because of non-payment caused by the Client's failure to pay.
The Main Contractor may withhold or deduct from any payment: amounts the Client withholds because of the Subcontractor's Work, Defects, or delay; amounts the Subcontractor owes the Main Contractor under this Agreement or any other agreement; and amounts reasonably needed to remedy Defects or cover unpaid claims by the Subcontractor's personnel or suppliers.
The Main Contractor will retain [percentage]% of each payment as retention, to be released within [number] Business Days after the Main Contractor receives the Client's corresponding release of retention under the Main Contract.
The Subcontractor must pay its own personnel, suppliers, and lower-tier subcontractors on time and, on request, give proof of payment and lien or claim waivers. The Subcontractor will keep the Project free of liens and claims arising from its Work and will remove any within [number] days after notice.
Payment is not acceptance of the Work and does not waive any right of the Main Contractor. Disputed amounts do not accrue interest unless required by law.
Flow-Down of Client Requirements
The Subcontractor agrees to be bound to the Main Contractor by the Client Requirements, and to perform the Work so that the Main Contractor can meet its obligations to the Client. As between the Main Contractor and the Subcontractor, the Subcontractor takes on, for the Work, all obligations and liabilities that the Main Contractor owes the Client under the Main Contract.
The Main Contractor will make the relevant parts of the Main Contract available to the Subcontractor, except for pricing and other confidential commercial terms, which the Main Contractor may redact. The Subcontractor must request clarification before starting if any Client Requirement is unclear. If the Main Contract and this Agreement conflict, the stricter requirement applies to the Subcontractor, unless the Main Contractor states otherwise in writing.
The Subcontractor will not do or fail to do anything that would put the Main Contractor in breach of the Main Contract. The Subcontractor is responsible for all Losses the Main Contractor suffers because the Subcontractor did not comply with the Client Requirements, including amounts the Client deducts, claims, or charges.
The Subcontractor will follow the Client's and the Main Contractor's site rules, safety rules, security rules, codes of conduct, and any rules on ethics, anti-corruption, data protection, and confidentiality that apply to the Project.
The Subcontractor will keep confidential all non-public information about the Project, the Client, the Main Contract, and the Main Contractor, use it only for the Work, and return or destroy it on request. This obligation continues for [number] years after this Agreement ends.
The Main Contractor's rights against the Client under the Main Contract, including its rights to claim extra time or money, will be exercised by the Main Contractor in its sole discretion. The Subcontractor's rights to relief for matters caused by the Client are limited to what the Main Contractor actually obtains from the Client for that matter.
The Subcontractor will give the Main Contractor the notices, records, and information it needs in time for the Main Contractor to meet the notice and reporting deadlines in the Main Contract. The Subcontractor will give notice within [number] days of any event that might lead to a claim, and failing that, waives the claim to the extent the delay in notice harms the Main Contractor.
Any ownership, intellectual property, or license rights that the Client holds in the Deliverables under the Main Contract will pass to the Main Contractor or the Client, as the Main Contractor directs, upon creation of the Deliverables. The Subcontractor assigns those rights accordingly, and keeps only a license to its own pre-existing materials, which it grants to the Main Contractor and the Client to use as part of the Deliverables.
Changes to the Work
The Main Contractor may at any time instruct changes to the Work, including additions, omissions, or changes to specifications, sequence, or timing. The Subcontractor will carry out such changes on receipt of a written instruction from the Main Contractor.
The Subcontractor must not make any change to the Work unless it holds a signed Change Order or written instruction from the Main Contractor. Work done without one is at the Subcontractor's own cost and risk.
If a change affects the price or time, the Subcontractor will give the Main Contractor a written proposal within [number] days after the instruction, setting out the effect on price and schedule with supporting detail. The Main Contractor will respond reasonably. If the Parties cannot agree, the Main Contractor may set a fair valuation, and the Subcontractor must proceed while any disagreement is resolved.
Any change that the Client orders under the Main Contract and that affects the Work will be passed on to the Subcontractor. Adjustments to the Subcontract Price or Completion Date for such a change will be limited to what the Main Contractor actually receives from the Client for the Work, less a reasonable administration charge of [percentage]%.
Changes in the Subcontract Price made by Change Order are payable on the same terms, including the pay-if-paid terms, as the Subcontract Price.
If a change reduces the Work, the Subcontract Price will be reduced by a fair amount, and the Subcontractor is not entitled to lost profit or overhead on omitted work.
The Subcontractor may not claim extra payment or time for any change, instruction, or event unless it has given written notice within [number] days after the event and a Change Order has been signed.
Quality, Inspection, and Defects
All Work and Deliverables must meet this Agreement, the Client Requirements, applicable laws, and the standards of a skilled and experienced provider in the industry. The Subcontractor will use only new, good-quality materials suitable for their purpose, unless stated otherwise.
The Subcontractor will maintain a quality control process that meets the Client Requirements and will keep complete written records of inspections and tests, which it will give to the Main Contractor on request.
The Main Contractor and the Client, and their representatives, may inspect and test the Work at any time and place, including during production and at the Subcontractor's premises. The Subcontractor will give reasonable access and assistance at no extra cost. Inspection does not relieve the Subcontractor of any obligation or waive any right.
When the Subcontractor believes the Work is complete, it will notify the Main Contractor in writing. The Main Contractor will have [number] Business Days, or longer if the Main Contract gives the Client more time to review, to accept the Work or give notice of Defects. The Work is accepted only when the Main Contractor says so in writing, and acceptance by the Main Contractor is not deemed to occur from silence or from the Client's use of the Work.
The Subcontractor will correct any Defect promptly, at its own cost, and within [number] days after notice, or sooner if needed to meet the Main Contract. The cost of correction includes the cost of removing, replacing, and re-testing affected work and any damage to other parts of the Project.
If the Subcontractor fails to correct a Defect in time, the Main Contractor may correct it itself or hire others to do so, and the Subcontractor will pay all resulting costs on demand. The Main Contractor may also reject the Work or reduce the Subcontract Price to reflect the reduced value of the Work.
The Subcontractor warrants that the Work and Deliverables will be free from Defects for [number] months after the later of final acceptance by the Client under the Main Contract and the date of acceptance by the Main Contractor, or for any longer period that the Main Contract requires for the Work. This warranty continues alongside any other rights the Main Contractor has.
The Subcontractor warrants that it has good title to all materials it supplies, free of any lien or encumbrance, and that the Work will not infringe any third party's intellectual property rights.
Insurance and Liability
The Subcontractor will keep the following insurance in force from the start of the Work until [number] years after completion, with insurers reasonably acceptable to the Main Contractor: general liability insurance of at least [amount] per occurrence; professional liability insurance of at least [amount] per claim, where relevant to the Work; workers' compensation or equivalent insurance as required by law; automobile liability insurance of at least [amount]; and any other insurance the Client Requirements demand, namely [other insurance].
The Subcontractor will name the Main Contractor and the Client as additional insured parties on its liability policies where possible, and will make the policies primary and non-contributory. The policies must include a waiver of the insurer's rights of recovery against the Main Contractor and the Client.
The Subcontractor will give the Main Contractor certificates of insurance before starting the Work and on each renewal. The policies must require at least [number] days' notice to the Main Contractor before cancellation or material change. If the Subcontractor fails to keep the insurance, the Main Contractor may buy it and charge the cost to the Subcontractor.
The Subcontractor will indemnify, defend, and hold harmless the Main Contractor, the Client, and their respective affiliates, officers, employees, and agents from all Losses arising from or connected with: the Subcontractor's breach of this Agreement; the negligence, wilful misconduct, or other fault of the Subcontractor, its personnel, or its lower-tier subcontractors; injury, death, or property damage caused by the Work; claims by the Subcontractor's personnel or suppliers; infringement of third-party rights; and any failure to comply with law or the Client Requirements.
The Subcontractor's liability under this Agreement is not capped. Nothing in this Agreement limits the Subcontractor's liability for any Losses it causes, whether direct or arising as a natural consequence of the breach.
The Main Contractor's total liability to the Subcontractor under this Agreement is limited to the unpaid portion of the Subcontract Price that has become payable under the pay-if-paid terms. The Main Contractor is not liable for lost profit, lost opportunity, indirect, special, or consequential Losses of the Subcontractor.
The Subcontractor carries the risk of loss of or damage to its own materials, tools, and equipment until the Work is accepted, whether or not stored at the Project site.
Nothing in this Agreement limits any liability that cannot be limited by law.
Ending the Subcontract
The Main Contractor may terminate this Agreement for convenience at any time by giving [number] days' written notice. In that case, the Main Contractor will pay the Subcontractor for Work properly performed up to the termination date, subject to the pay-if-paid terms, plus reasonable, documented, unavoidable demobilization costs, and nothing else, including lost profit.
If the Main Contract ends or is terminated, suspended, or cancelled for any reason, in whole or as it affects the Work, the Main Contractor may immediately end or suspend this Agreement by written notice. The Subcontractor's compensation in that case is limited to payment for Work properly performed up to the notice date, to the extent the Main Contractor receives corresponding payment from the Client.
The Main Contractor may terminate this Agreement immediately by written notice if the Subcontractor: materially breaches this Agreement and fails to fix the breach within [number] days after notice; becomes insolvent or bankrupt, or makes an arrangement with its creditors; fails to maintain required insurance, licenses, or permits; repeatedly delays the Work or produces Defects; or acts in a way that puts the Main Contractor in breach of the Main Contract.
The Subcontractor may terminate this Agreement only if the Main Contractor materially breaches it, other than failure to pay amounts that are not yet due under the pay-if-paid terms, and does not fix the breach within [number] days after written notice from the Subcontractor.
If the Main Contractor terminates for the Subcontractor's default, the Main Contractor may take over the Work, use the Subcontractor's materials and Deliverables on site, and complete the Work itself or through others. The Subcontractor will pay the extra cost of completion above the unpaid Subcontract Price, and the Main Contractor need not pay the Subcontractor further until the Work is completed and all Losses are determined.
On termination or expiry, the Subcontractor will stop work as directed, protect the Work and the site, hand over all Deliverables, work in progress, records, and Main Contractor or Client property, and remove its equipment and personnel.
Sections that by their nature should continue, including those on payment conditions, warranties, insurance, indemnity, confidentiality, and dispute resolution, survive termination or expiry. Termination does not affect rights that arose before it.
Governing Law and Dispute Resolution
This Agreement and any dispute arising out of or in connection with it are governed by the laws of [governing jurisdiction], without regard to its conflict of laws rules.
The Parties will first try to resolve any dispute through good-faith discussions between senior representatives for [number] days after one Party gives written notice of the dispute.
If a dispute under this Agreement relates in whole or in part to matters that are, or could become, in dispute between the Main Contractor and the Client under the Main Contract, the Subcontractor agrees that the dispute will be resolved together with, and in the same manner as, the dispute under the Main Contract, using the dispute resolution process stated in the Main Contract, which is [description of the Main Contract dispute process and forum].
The Subcontractor agrees to be bound by the outcome of that process, including any decision, award, or judgment, to the extent it relates to the Work. The Subcontractor will take part in the process as the Main Contractor reasonably requires, including by giving evidence and documents, and at its own cost. The Main Contractor may bring the Subcontractor in as a party, or may present the Subcontractor's claims on its behalf, in which case the Subcontractor will be bound by the Main Contractor's handling.
Any Main Contract decision or award that finds the Client does not owe the Main Contractor for the Work, or that reduces the amount owed, will reduce what the Main Contractor owes the Subcontractor accordingly.
If the Main Contract process does not apply or cannot include the Subcontractor, the dispute will be finally resolved by [arbitration or court, rules, seat, and language], and the Parties submit to the exclusive jurisdiction of [courts or forum].
The Subcontractor must continue to perform the Work during any dispute, and may not suspend work or withhold Deliverables.
Either Party may seek urgent injunctive or interim relief from a competent court to protect confidential information or intellectual property. Each Party bears its own costs, but the arbitrator or court may award costs to the Main Contractor if it substantially prevails.
General Terms
This Agreement is the entire agreement between the Parties about the Work and replaces all earlier discussions, proposals, and agreements on the subject. It may be changed only in writing signed by both Parties, except that Change Orders may be signed by the Main Contractor's authorized representative as stated in this Agreement.
The Subcontractor may not assign, transfer, or delegate this Agreement or any right or duty under it without the Main Contractor's prior written consent. The Main Contractor may assign this Agreement, in whole or in part, to the Client, to an affiliate, or to a successor to the Main Contract.
Notices must be in writing and delivered by hand, courier, or email with confirmation to the address of the receiving Party stated in the signature section, or to another address that Party notifies. Notices are effective on delivery, or on the next Business Day if delivered outside business hours.
If any provision of this Agreement is found invalid or unenforceable, the rest of the Agreement continues in force, and the Parties will replace the provision with a valid one that comes closest to its intent.
A failure or delay by either Party to enforce a right is not a waiver of that right. A waiver is effective only if in writing.
The Subcontractor will comply with all applicable laws on anti-corruption, sanctions, export controls, labor, health and safety, and the environment, and will not offer or accept improper payments in connection with the Project.
The Subcontractor may not use the Main Contractor's or the Client's name or logo in publicity without prior written consent.
This Agreement may be signed in counterparts and by electronic signature, each of which is an original and which together form one agreement. Headings are for convenience only. There are no third-party beneficiaries, except that the Client may enforce the provisions expressed to benefit it.
The Parties have signed this Agreement as of the Effective Date.
MAIN CONTRACTOR: [Main Contractor legal name]
Signature: [signature]
Name: [authorized signatory name]
Title: [title]
Date: [date]
Address for notices: [address]
Email for notices: [email]
SUBCONTRACTOR: [Subcontractor legal name]
Signature: [signature]
Name: [authorized signatory name]
Title: [title]
Date: [date]
Address for notices: [address]
Email for notices: [email]